YearProject NameProject Value RangeProject Category
2016Supply, Install, Test and Commission of Proposed Security Systems 1million - 10millionOil & Gas/Marine.
2016Supply HVAC MCC/UCP Panels for YAMAL LNG Project (Batch 5)1million - 10millionOil & Gas/Marine.
2016Mechanical & Electrical Works for Multi-purpose Buildings on Lot 04704P MK07 at Tuas South Boulevard (Tuas Planning Area)1million - 10millionBuilding.
2016Supply & Installation of Electrical Works for 600 Tons Crane 1million - 10millionOil & Gas/Marine.
2016Supply HVAC MCC/UCP Panels for YAMAL LNG Project (Batch 4)1million - 10millionOil & Gas/Marine.
2016Supply Cable, Manpower & Equipment, Installation & Termination SFC 1,2,3, & 4 at Phase 2 Tuas South Boulevard100k - 1millionOil & Gas/Marine.
2016Supply Manpower and Installation of Electrical Services for Mandai Depot100k - 1millionTransportation.
2015Supply Materials & Installation Of Electrical Works On Convenyor For T41million - 10millionAirport.
2015Supply Manpower 7 tools for laying of H.T cable at Global Foundaries In Woodlands Industrial Park DBelow 100kIndustrial.
2015Supply of Level Switch and panel modification for Warehouse 1,2,3Below 100kIndustrial.
2015 Supply of Design, Engineering, Software, Panel, Testing and Commissioning of CDDMS A&A Works for NEL -Little India MRTBelow 100kBuilding.
2015Proposed Docks, wharves, quay, piers and others ancillary works in new shipyard (phase 2)Above 10 millionOil & Gas/Marine.
2015Supply & Install Electrical Work for mobile shelter at Megayard100k - 1millionInfrastructure.
2015Yamal LNG Project (Batch 2)- Supply manpower & materials to fabricate lighting & small power panels100k - 1millionOil & Gas/Marine.
2015Supply Material, Manpower & Tools to Fabricate HVAC System Control Panel for YAMAL LNG Project100k - 1millionOil & Gas/Marine.
2015Phase 2 Electrical Installation Works 2 Number Of A 2 Storey 22kv Electrical Substation100k - 1millionBuilding.
2015Upper Zakum 750 Island Surface Facilities EPC 2 project100k - 1millionPlant.
2015T2015_011-Installation of SCADA system for phase 3 tank at Penjuru Terminal100k - 1millionOil & Gas/Marine.
2015Supply & Installation Works at Changi T2Below 100kAirport.
2015SUPPLY MANPOWER, MATERIAL & INSTALLATION ON CCTV WORKS T4 CHANGI AIRPORT100k - 1millionAirport.
2015PROCUREMENT OF WATER HANDLING EQUIPMENT1million - 10millionTransportation.
2015SUPPLY & FABRICATE OF SS316 PILLAR BOX (1250A, 800A 3PHASE, 60Hz)100k - 1millionBuilding.
2015Supply Pipeworks at Tuas South Boulevard100k - 1millionInfrastructure.
2015Enquiry for Telephone and Network System (Sembmarine Integrated Yard @ Tuas)100k - 1millionOil & Gas/Marine.
2015SUPPLY OF WELDING PANEL FOR JURONG SHIPYARD PHASE 2100k - 1millionOil & Gas/Marine.
2015SUPPLY DATWYLER FIBER & CAT6A CABLE ACCESSORIES FOR T4 CHANGI AIRPORTBelow 100kAirport.
2015Additional Electrical Work for Welding Panel At Central Hull shop1million - 10millionOil & Gas/Marine.
2015YAMAL LNG MCC UCP - BATCH 31million - 10millionOil & Gas/Marine.
2015Supply, Delivery, Installation Works, Testing & Commissioning of Electrical works at Pump room #3 & #4 100k - 1millionPlant.
2014Brasil - Pillar Box (8 sets)Below 100kBuilding.
2014Supply Installation Of Slop Pump Control Panel And Laying Of Cable At Jetty 2Below 100kOil & Gas/Marine.
2014Supply And Install New Cables for the 41Nos. of Lighting At Jetty 3 (hvt rvd PO)Below 100kOil & Gas/Marine.
2014Supply Manpower & Material For Electrical Installation at MRB Platform C1565Below 100kBuilding.
2014Supply Material, Manpower & Tools for Electrical Works at T3 Server RoomBelow 100kAirport.
2014Supply labour, material and equipment to carry out electrical works for Jack up leg facilities c/w MV and LV1million - 10millionOil & Gas/Marine.
2014Yamal LNG Project - HVAC100k - 1millionOil & Gas/Marine.
2014Yamal LNG Project - MCC UCP100k - 1millionOil & Gas/Marine.
2014Integrated Panel 3 units and Pillar Box 3 unitsBelow 100kOil & Gas/Marine.
2014Installation of Level switch with alarm at Jetty Berth 1,2&3 - Tender 2014-026Below 100kOil & Gas/Marine.
2014Installation of Leak detection system at Warehouse 1,2&3 - Tender [2014-025]Below 100kOil & Gas/Marine.
2014Supply & Installation Works on Electrical Works for Baby RT and CC Room at T2 Changi AirportBelow 100kBuilding.
2014Central Hull WorkshopAbove 10 millionOil & Gas/Marine.
2014Supply material, technician & supervisor for electrical installation works on chemical injection package (ZZZ-3300)Below 100kPlant.
2014MOV FOR UTILITY TANKS AT PIT 3100k - 1millionOil & Gas/Marine.
2014Supply & Installation Concrete Plinth For Lamp Post At 1, Pasir Ris CloseBelow 100kBuilding.
2013Minor Works at Circle Line Stations, Tunnels and Depot100k - 1million-
2013Installation of Fiber & Voice Backbone at JSPL Megayard100k - 1million-
2013Installation of NSLE - C1565-LV Power System100k - 1million-
2012Supply new controller panels and electrical installation work for KPE/MCE Tunnel Upgrading project100k - 1million-
2012Installation on all Pillar box at  Mega Yard, Supply, Fabricate & installation on all Pillar box100k - 1million-
2012Installation on all electrical works at Mega Yard, Material and installation on all electrical works          100k - 1million-
2012Tembusu Waste Water Treatment Plant Associated Works100k - 1million-
2012Electrical Upgrading work for LTDB Panel Upgrade Sebarok Phase 1 & 2 100k - 1million-
2012Electrical works for Installation Of Tank Overfill Protection Project100k - 1million-
2012Electrical Installation work for Tai Seng Facility Building100k - 1million-
2012Installation of Ventilation at Elevated MRT Stations, Provision of Jet Fans100k - 1million-
2012Electrical & Mechanical Ventilation Installation in New Shipyard   100k - 1million-
2012Installation of Mechanical and Electrical works in Dormitories at Tuas South Boulevard      100k - 1million-
2012M&E Installation for Package B & C  in Workshop at Tuas South Boulevard100k - 1million-
2011Provide light fitting , DB, tape off box and electrical installation100k - 1million-
2011electrical system upgrading for plant oil terminal upgrading project100k - 1million-
2011Down Town Line 1,2 &3, Design, Software Engineering, manufacture of CDMS system for 15 CD station100k - 1million-
20114.BNV, HLV, ONH & KRG Stations, On A&A Electrical Works.100k - 1million-
2011Harbour Front MRT Station, On A&A Electrical Works.100k - 1million-
2011Electrical installation work100k - 1million-
2011Supply, fabricate & Installation of MCP Panel100k - 1million-
2011A&A and modification project  on all electrical works including  testing and commissioning of panels100k - 1million-
2011System study and improvement for Plant Electrical System100k - 1million-
2011 Supply E&I Equipment for Plant Energy Project100k - 1million-
2011Building Electrical Systems, supply of UPS system for server room at corporate office100k - 1million-
2011Automation system SICC Upper Thomson, design, supply & installation of conveyor system project100k - 1million-
2010Fabricate and built all electrical control panel for DOHA International Airport and installation onsite at Qatar, Doha100k - 1million-
2010On all electrical installation, project management, termination, testing & commissioning100k - 1million-
2010On all electrical installation, project management, termination, testing & commissioning on lightings, switches and CCTV to distribution panels at Terminal100k - 1million-
2010Fabricate and built all electrical control panel for Jordan International Airport and pre-wiring works test installation100k - 1million-
2010On all electrical installation, project management, termination, testing & commissioning. lightning protection system diversion works100k - 1million-
2010Fabricate and built all electrical control panel for MADURAI India Airport and pre-wiring works test installation100k - 1million-
2010Fabricate and built all electrical control panel for Chennai International Airport, India and pre-wiring works test installation100k - 1million-
2010Supply & intallation on all electrical works, project management, termination, testing & commissioning100k - 1million-
2010Design, supply & install lightning protection system, fire alarm, emergency lightings, exit light at PipeRack Warehouse 6 & 7.100k - 1million-
2010Troubleshooting, testing and commissioning of TPE, pressure pot for PTTPL plant in Thailand100k - 1million-
2010 Supply material & tools to fabricate and built FDB Panel for Abu Dhabi PFSGRT Airport100k - 1million-
2010Supply material & electrical installation for Tanjung Kling Sea Dragon & Atwood Office etc servicing of air-con osolator at Pulau Semulun yard Office AHU Room package unit servicing100k - 1million-
2010On all electrical installation, project management, termination, testing and commissioning including A&A and modification works100k - 1million-
2009Design, Supply all electrical installation, project management, termination, testing & commissioning100k - 1million-
2009Electrical Installation for Botanic Garden MRT Station, Kent Ridge MRT Station, Buona Vista MRT Station, Holland Vista MRT Station100k - 1million-
2009Changi - Design, fabricate of electrical control panel & onsite installation, termination, testing & commissioning100k - 1million-
2009Setup from old process equipment line, project management to re-installation on all electrical wiring to process line equipments, termination, testing & commissioning100k - 1million-
2009Resort World Sentosa Project - On all electrical installation, project management, termination, testing & commissioning100k - 1million-
2009Supply & installation of street lightingss project including modification of distribution board panel, termination to live turn-on100k - 1million-
2009 Maintenance building M&E and A&A on all electrical works, including troubleshooting and findings on electrical fault100k - 1million-
2009 On all electrical installation, project management, termination, testing & commissioning100k - 1million-
2009Design, fabricate of electrical control panel on onsite installation, termination and testing100k - 1million-
2009for Winnipeg International Airport and Phoenix International Airport - Fabricate and built all electrical control panel under UL certification and testing100k - 1million-
20091 New Factory premises - Design, supply & install all electrical works on lightings and power including all main and sub-main DB panels100k - 1million-
20091Design, fabricate, supply and installation of emergency control panel including led rope light to be incorporated100k - 1million-
2008 Harbour Front and One North CCL State 4 & 5 - On all electrical installation, project management, termination, testing & commissioning100k - 1million-
2008 4 storey new office building - Design, supply and install all lightings and air-conditioning system including main LV panel and all sub DB electrical panels and project management100k - 1million-
2008Changi Airport - On all electrical installation and modification including project management for baggage handling system, Terminal 2100k - 1million-
2008Total petrochemical system upgrading - Design and electrical installation of A&A electrical works including dismantle and reinstate of all upgrading areas100k - 1million-
2008Electrical installation for Bishan MRT project, Lorong Chuan MRT project, Harbour Front MRT station and One North MRT station - On all electrical installation, project management, termination, testing and commissioning100k - 1million-
2007 Changi Airport - On all electrical installation and project management for baggage handling system, Terminal 3100k - 1million-
2007China Beijing Project - Fabrication of electrical control panel and wiring installation onsite100k - 1million-
2007KKIA Project - Project management and all electrical installation and modification works onsite for panel wiring on all electrical control panels100k - 1million-
2007Serangoon MRT Project - On all electrical installation and project management to termination and modification works100k - 1million-
2007Changi Airport - On electrical installation and project management for the upgrading work at Terminal 1 and 2100k - 1million-
2006 Changi Airport - On all electrical installation and project management for baggage handling system, Terminal 3100k - 1million-
2006Shanghai Project - On installation of panel wiring for control panel100k - 1million-
2006UK Project - On installation in Singapore on Panel wiring for control panel100k - 1million-
2006Serangoon MRT Project - On electrical installation and project management to termination, correction and modification works100k - 1million-
2005 Changi Airport - On electrical installation & project management for baggage handling system, Terminal 3100k - 1million-
2005CPSC - On project management and electrical installation100k - 1million-
2005Vopak, Pulau Seborak - On design, modification and installation of control panel and electrical works for plant upgrading works100k - 1million-
2005Total Petrochemical Pte Ltd - On project management and electrical installation for all compound line at plant100k - 1million-
2005Chervon Oronite - On project management and electrical installation for plant upgrading works100k - 1million-
2005Siemens Pte Ltd - On project management and all electrical site installation for GLS conveyor system100k - 1million-
2004 Starhub - On installation of outdoor antennaBelow 100k-
2004Senoko - On electrical and equipment installation for cables tunnel CCTV, FIDS and BACS100k - 1million-
2004GE Plastic Singapore - On electrical installation and project management for line 8 processing plant100k - 1million-
2003 Sembawang Utilities Terminal - On electrical, control system installation, project management, design and replacement of cable ladder for Demin Plant analyzer100k - 1million-
2003Changi Airport - On electrical and control system installation for baggage handling system at Terminal 1 & 2100k - 1million-
2003Hamilton Sundstrand - Project management and installation of power management system100k - 1million-
2003Eastman Fiber Glass - On electrical and accessories installation worksBelow 100k-
2002 Harbour Front MRT Station Building on installation of automation system100k - 1million-
2002Glaxo Smith Kline - On eletrical and control installation for Motor Control CentreBelow 100k-
2001 Asahi - On all electrical control and installation for conveyor system at Jurong Plant100k - 1million-