Past Project References

2014

Building / Commercial
  • Electrical works in Yishun Community Hospital
Industrial & Factory
  • Electrical works in Jurong Ship Yard – Jackup leg facilities, Central Hull Workshop
  • Central Hull Workshop
  • Yamal LNG HVAC Project – Control Panels (Batch 1)
Infrastructure
  • Supply Material, Manpower & Tools for Electrical Works at T3 Changi Airport Server Room

2015

Building / Commercial
  • Supply Manpower & tools for laying of H.T cable at Global Foundries In Woodlands Industrial Park D
Industrial & Factory
  • Electrical works in Jurong Ship Yard – New shipyard Phase 2 – 22KV Substation, Proposed Docks, wharves, quay, piers, others ancillary works
  • Proposed Docks, wharves, quay, piers and others ancillary works in new shipyard (phase 2)
  • Additional Electrical Work for Welding Panel At Central Hull shop
  • Yamal LNG HVAC Project – Control Panels (Batch 2 & 3)
  • Telephone and Network System (Sembmarine Integrated Yard @ Tuas)
  • YAMAL LNG MCC UCP – BATCH 3
Infrastructure
  • LTA Contract C8380 – Water Handling Equipment replacement works
  • Changi Airport T4 – Baggage Handling System Conveyors – Electrical & CCTV works
  • Supply Materials & Installation of Electrical Works On Convenor For T4 Changi Airport
  • Phase 2 Electrical Installation Works 2 Number Of A 2 Storey 22kv Electrical Substation

2016

Building / Commercial
  • Supply, Install, Test & Commissioning of Proposed Security System
  • Electrical works in Jurong Ship Yard – Multipurpose Function Building & 600T Crane at Tuas South Boulevard
Industrial & Factory
  • Supply, Design, Install, Test & Commission of UPS and Wiring for Fire Shutter Door
  • Supply Manpower For Additional Work To Change Light Fitting, UFO & Speasker For YCH Project
  • Supply & Installation of Electrical Works for 600 Tons Crane
  • Yamal LNG HVAC Project – Control Panels (Batch 4 & 5)
  • YAMAL HVAC MCC UCP – BATCH 5
Infrastructure
  • Supply & Installation Works for Earth Bar on Connection for T4 Changi Airport
  • Supply, Installation and Testing of CAT6A and Fiber Optic Cable at T4 Changi Airport
  • Supply & Install Additional CCTV Bracket, CAT6A Cable & Additional Monitor Point for T4 Changi Airport
  • Electrical works for LTA Mandai Deport at Stabling Area & Permanent Way Workshop
  • Supply Manpower and Installation of Electrical Services for Mandai Depot
  • Contract 1565 – Supply Manpower to Modify and Replace of Faulty Lighting at Marina Station

2017

Building / Commercial
  • Electrical works for BCA Pulau Punggol Aggregate Terminal & Tuas Aggregate Terminal
  • Electrical works for Sembcorp Marine Integrated Yard Corporate Office – 3 Blks of ancillary building comprising 2 blocks of 6 Sty & 11 Sty office Blk and 1 Blk of 6 sty MSCP with canteen at Tuas South Boulevard
  • R&R Pulau Punggol Aggregate Terminal and Tuas Aggregate Terminal
  • Electrical works for ECO – 3 Storey Control Operational Building & 2 Storey Production Blk to the Existing Single User Factory at 23 Tuas View Circuit
  • A&A Works for Sembcorp Marine Integrated Yard – Tuas Yard PCC Office level 3 to 6
  • A&A Works for Sembcorp Marine Integrated Yard – Multi Function Building at Tuas South Boulevard
Institution
  • Electrical Works at Blk 17 Temasek Polytechnic
Infrastructure
  • Contract 8368 – Minor work for cable Replacement at CCL4 and 5
  • Supply Material & Manpower to Relocate and Installation on Electrical Works at T4 Changi Airport
  • Supply Manpower to Lay Earth Cable at NS3 Tunnel1, 2 & 3
  • Electrical Works for North South Transmission Cable Tunnel NS3 Project
  • Design, Build, Supply and Install for Safety Features in Circle Line Station
  • Electrical Installation at Mandai Depot

2018

Building / Commercial
  • Electrical works for ECO – Pumps & Colling Tower Fans at Central Operation Building at 23 Tuas View Circuit
  • Electrical works for Corporate Office, Customer Office, Multi-Storey Carpark & Guardhouse Security System
  • Supply Manpower Installation Works on Pressure Switch at Tan Tock Seng Hospital
  • Supply Material, Manpower to Modify and Installation Works on Panel at TTS Hospital
Industrial & Factory
  • Electrical works for Sembcorp Marine Integrated Yard – 10 Blks of Industrial Development Comprising 2 Storey Warehouse, 5 Blks of Workshops and 4 Blks of Ancillary Building and Ancillary Works in New Shipyard (PHASE 3A) at Tuas South Boulevard
  • Electrical works for Sembcorp Marine Integrated Yard – 3 Nos. of Single Storey Mobile Shed and 1 No. of Single Storey Robotic Workshop to the Existing Development (PHASE 3A) at Tuas South Boulevard
  • Electrical works for Sembcorp Marine Integrated Yard – Single Storey Production Workshop to the Existing Shipyard Development at Tuas South Boulevard
  • A&A Works for Sembcorp Marine Integrated Yard – MFH3 3rd Storey Renovation to the Existing Shipyard at Tuas South Boulevard
  • Proposed Emergency Voice Communication System at Tuas View Circuit
  • HT and LT Network Distribution in Sembcorp Marine Integrated Yard – New Shipyard (PHASE 3A) at Tuas South Boulevard
Institution
  • A&A works at Yunnan Garden, Nanyang Lake and Plaza Fronting Chinese Heritage Centre at Nanyang Technological University
Infrastructure
  • Electrical Installation Works for Hotbag, ATR, EBS at T3 Changi Airport
  • LTA Contract 1810 – M&E Modification works for Sentosa Facility Building

2019

Industrial & Factory

  • Design, Supply, Install, T&C of security systems in new shipyard (Phase 3A)
  • Proposed Supply, Installation, Testing & Commissioning for Corporate Office
  • Security System IT Network Cabling works for Sembcorp Marine Integrated Yard
  • D&B of Electrical works for 3 Blocks of Kingsville Kallang Industrial Building

Building / Commercial

  • D&B of Electrical works for Grab?

Infrastructure

  • D&B of Electrical works for PSA Tuas Terminal Gate
  • LTA Contract R1022 – Replacement of Sump and Ejector Pumps in North South East West MRT lines