2014 |
---|
Supply labour, material and equipment to carry out electrical works for Jack up leg facilities c/w MV and LV |
Central Hull Workshop |
Yamal LNG Project - HVAC |
2015 |
---|
M&E Ventilation Installation for Proposed docks, wharves, quay, piers & other ancillary works in New Shipyard (Phase 2) |
Proposed Docks, wharves, quay, piers and others ancillary works in new shipyard (phase 2) |
Additional Electrical Work for Welding Panel At Central Hull shop |
Supply Material, Manpower & Tools to Fabricate HVAC System Control Panel for YAMAL LNG 2 Project |
Telephone and Network System (Sembmarine Integrated Yard @ Tuas) |
YAMAL LNG MCC UCP – BATCH 3 |
2016 |
---|
Supply, Design, Install, Test & Commission of UPS and Wiring for Fire Shutter Door |
Supply Manpower For Additional Work To Change Light Fitting, UFO & Speasker For YCH Project |
Supply & Installation of Electrical Works for 600 Tons Crane |
YAMAL HVAC MCC UCP - BATCH 4 |
YAMAL HVAC MCC UCP - BATCH 5 |
2017 |
---|
Supply & Install of A&A Works for Multi Function Building at Tuas South Boulevard |
2018 |
---|
Proposed Erection of 10 Blks of Industrial Development Comprising 2 Storey Warehouse, 5 Blks of Workshops and 4 Blks of Ancillary Building and Ancillary Works in New Shipyard (PHASE 3A at Tuas South Singapore |
Proposed Erection of 3 Nos. of Single Storey Mobile Shed and 1 No. of Single Storey Robotic Workshop to the Existing Development (PHASE 3A) at Tuas South Boulevard |
Proposed A&A Works for Single Storey Production Workshop to the Existing Shipyard Development Lot 4235N MK07 at Tuas South Boulevard |
A&A Works for MFH3 3rd Storey Renovation to the Existing Shipyard at Tuas South Boulevard |
Proposed Emergency Voice Communication System at Tuas View Circuit |
HT and LT Network Distribution in New Shipyard (PHASE 3A) at Tuas South Boulevard |
2019 |
---|
Design, Supply, Install, T&C of proposed security systems in new shipyard (Phase 3A) |
Proposed Supply, Installation, Testing & Commissioning for Corporate Office |
Security System IT Network Cabling and Accessories for TBY |
2014 | 2015 | 2016 | 2017 | 2018 | 2019 |
---|---|---|---|---|---|
Supply labour, material and equipment to carry out electrical works for Jack up leg facilities c/w MV and LV Central Hull Workshop Yamal LNG Project - HVAC |
M&E Ventilation Installation for Proposed docks, wharves, quay, piers & other ancillary works in New Shipyard (Phase 2) Proposed Docks, wharves, quay, piers and others ancillary works in new shipyard (phase 2) Additional Electrical Work for Welding Panel At Central Hull shop Supply Material, Manpower & Tools to Fabricate HVAC System Control Panel for YAMAL LNG 2 Project Telephone and Network System (Sembmarine Integrated Yard @ Tuas) YAMAL LNG MCC UCP – BATCH 3 |
Supply, Design, Install, Test & Commission of UPS and Wiring for Fire Shutter Door Supply Manpower For Additional Work To Change Light Fitting, UFO & Speasker For YCH Project Supply & Installation of Electrical Works for 600 Tons Crane YAMAL HVAC MCC UCP - BATCH 4 YAMAL HVAC MCC UCP - BATCH 5 |
Supply & Install of A&A Works for Multi Function Building at Tuas South Boulevard | Proposed Erection of 10 Blks of Industrial Development Comprising 2 Storey Warehouse, 5 Blks of Workshops and 4 Blks of Ancillary Building and Ancillary Works in New Shipyard (PHASE 3A at Tuas South Singapore Proposed Erection of 3 Nos. of Single Storey Mobile Shed and 1 No. of Single Storey Robotic Workshop to the Existing Development (PHASE 3A) at Tuas South Boulevard Proposed A&A Works for Single Storey Production Workshop to the Existing Shipyard Development Lot 4235N MK07 at Tuas South Boulevard A&A Works for MFH3 3rd Storey Renovation to the Existing Shipyard at Tuas South Boulevard Proposed Emergency Voice Communication System at Tuas View Circuit HT and LT Network Distribution in New Shipyard (PHASE 3A) at Tuas South Boulevard |
Design, Supply, Install, T&C of proposed security systems in new shipyard (Phase 3A) Proposed Supply, Installation, Testing & Commissioning for Corporate Office Security System IT Network Cabling and Accessories for TBY |
2014 | 2015 | 2016 | 2017 | 2018 | 2019 |
---|---|---|---|---|---|
Supply labour, material and equipment to carry out electrical works for Jack up leg facilities c/w MV and LV | M&E Ventilation Installation for Proposed docks, wharves, quay, piers & other ancillary works in New Shipyard (Phase 2) | Supply, Design, Install, Test & Commission of UPS and Wiring for Fire Shutter Door | Supply & Install of A&A Works for Multi Function Building at Tuas South Boulevard | Proposed Erection of 10 Blks of Industrial Development Comprising 2 Storey Warehouse, 5 Blks of Workshops and 4 Blks of Ancillary Building and Ancillary Works in New Shipyard (PHASE 3A at Tuas South Singapore | Design, Supply, Install, T&C of proposed security systems in new shipyard (Phase 3A) |
Central Hull Workshop | Proposed Docks, wharves, quay, piers and others ancillary works in new shipyard (phase 2) | Supply Manpower For Additional Work To Change Light Fitting, UFO & Speasker For YCH Project | Proposed Erection of 3 Nos. of Single Storey Mobile Shed and 1 No. of Single Storey Robotic Workshop to the Existing Development (PHASE 3A) at Tuas South Boulevard | Proposed Supply, Installation, Testing & Commissioning for Corporate Office | |
Yamal LNG Project - HVAC | Additional Electrical Work for Welding Panel At Central Hull shop | Supply & Installation of Electrical Works for 600 Tons Crane | Proposed A&A Works for Single Storey Production Workshop to the Existing Shipyard Development Lot 4235N MK07 at Tuas South Boulevard | Security System IT Network Cabling and Accessories for TBY | |
Supply Material, Manpower & Tools to Fabricate HVAC System Control Panel for YAMAL LNG 2 Project | YAMAL HVAC MCC UCP - BATCH 4 | A&A Works for MFH3 3rd Storey Renovation to the Existing Shipyard at Tuas South Boulevard | |||
Telephone and Network System (Sembmarine Integrated Yard @ Tuas) | YAMAL HVAC MCC UCP - BATCH 5 | Proposed Emergency Voice Communication System at Tuas View Circuit | |||
YAMAL LNG MCC UCP – BATCH 3 | HT and LT Network Distribution in New Shipyard (PHASE 3A) at Tuas South Boulevard |
Puretech Engineering was established in 1995 with the purpose of providing Mechanical & Electrical Engineering Services. Our success to date is built on our ability to perfectly synergise innovation and creative technical electrical solutions.
Monday to Friday: 8.30am – 6.15pm
Weekend & Public Holiday: Closed
Puretech Engineering Pte Ltd 2024. All Rights Reserved.